Specifier Login

Agent Login

Home

what clients say

"The Bow Screen developed by Clearmake screens off grass clippings from the wash-bay water and significantly reduces the volume that passes through the separator and surrounding infrastructure. This ensures the waste water is able to be treated to a level suitable for discharge.

We selected Clearmake because we have used their equipment before and because they were keen to work with the Golf Course Industry to come up with a solution for this problem.

We are very pleased with the performance of the Bow Screen and I would recommend Clearmake to other industry facilities looking for a similar solution."

Pennant Hills Golf Club

"The Clearmake brand is now well established within the marina industry. The systems are recognised by local councils and relevant State departments. This is the third facility that I have managed where we have implemented a Clearmake system. Past experiences with all equipment have been positive. The support offered by the Clearmake team has always been immediate. In essence the product represents a 'win win' for industry and environment."
Gold Coast City Marina

"To support Patrick's expansion at the Port of Brisbane, we appointed Clearmake to design and manufacture a custom system to significantly reduce on-site water consumption and environmental pollution from the new site. The result was a combined technology solution, incorporating stormwater management, rainwater harvesting, wash-down waste water treatment and recycling and sludge dewatering. The system provides up to 50 kL/h of water for on-site reuse including vehicle wash down, irrigation and toilet flushing, with excess water treated and safely discharged to stormwater. This has minimised mains water use and has provided effective, systemic protection for the Brisbane River and Moreton Bay from pollution generated on the site. Clearmake has provided extremely professional assistance during all phases of the project and the team has been a pleasure to work with - I look forward to working with Clearmake again on Patrick's next project."
Patrick Terminals

"We recently selected Clearmake to design and manufacture a solution for our Shipyard waste water treatment project. They designed and developed a custom system which proved to be the most effective available in terms of capital investment, operating costs, water quality produced, ease of operation and reliability."
Runaway Bay Marina

"We selected Clearmake to develop a system for treating and recycling water from our wash down facility for reuse back through the wash bay, as they have demonstrated great success with their equipment and are extremely well regarded within the water treatment industry. We have been satisfied with our Clearmake experience and plan to use them again in the future."
Ostwald Bros Civil Pty Ltd

"Clearmake recently developed a system to filter and recycle water from our vessel pressure wash down bay to a level suitable for reuse. They are very easy to work with and provide excellent customer service from design through to installation and operation of the system."
Gold Coast Marine Centre

"Mackay Marina Village's water treatment system was developed and installed by Clearmake, and is able to treat 3,000 L/h of water for oil and grease, total suspended solids (TSS), total dissolved solids (TDS) and biochemical oxygen demand (BOD). A recent audit by the Environmental Protection Agency rated our facility as above compliance, and we ensure that water quality remains high through regular testing."
Port Binnli Group (taken from the Eco-efficiency for the Marine Industry publication by the Queensland Government)

"The in house designed pre-treatment collection pit is the best designed and operating pit that I have come across. It successfully captures 99% of the solids produced and therefore minimises the load on the coalescing plate interceptor. The fold down basket lift point is a particularly clever design addition as it allows for a mechanical means (fork lift) of emptying the solids collected and has the added benefit of addressing OH & S issues associated with heavy lifting. Could be scope for a patent there!

The operating procedure and maintenance schedule are comprehensive, adequate and adhered to. This procedure could be adopted at other similar sites.

When assessing suitable treatment facilities only 2 types were found that claimed they could treat effluent containing emulsion. One unit came with a $50,000 price tag and the unit we chose, a Clearmake, with a much lower price tag (around $4,500?). The Clearmake unit is operating as promised, successfully eliminating emulsion from the waste stream.

The procedures adopted for dealing with waste water collected in the emulsion tank bunded area have been totally successful. If adhered to I am satisfied this procedure will make the standard LTW requirement for the tank's bunded compound to be roofed over obsolete, providing significant cost savings. Very professional guys."

Liquid Trade Waste Officer